Transfer Chute Support Structure

A new transfer point will be installed on conveyor S2. The transfer point will include the tail end of conveyor CV006 as well as the tail end of a new conveyor S3. A new WEBA chute system will also be installed at this point to facilitate the changeover between the conveyors. The new chute system requires a support structure and access platforms.

STRUCTURAL DESIGN

The preliminary design will include a concept proposal, for approval, before the detail design commence. Once this process is complete the detail design will commence with the structural analysis of the structure in accordance with the relevant design codes.

With the structural analysis finalised and the beam sizes defined the detail drawings will be produced from the main assembly.